Excavating proved more challenging than anticipated. As a result, the window of no water impact has been extended. We hope to have water restored to Lowell Street and the side streets off Lowell between 5:30 pm and 6:30 pm. Water on Durham Drive will restored approximately an hour later between 6:30 pm and 7:30 pm. We apologize for the inconvenience.